2 CAR § 1-302. Narrative summary

        2 CAR § 1-302. Narrative summary.

        (a)(1) A narrative description of the proposed project is required.

                (2) The format, style of presentation, and length may vary depending on the nature of the project.

        (b) The narrative shall include the following sections:

                (1)(A) Ownership.  

                        (B) Legal ownership along with the names, titles, contact information, and roles of principal participants in feedstock processing facility;

                (2)(A) Location.

                        (B) Physical address of facility;

                (3)(A) Description of current operation.

                        (B) If in operation, describe facility including:

                                (i) Feedstock processed;

                                (ii) Current market;

                                (iii) Production levels; and

                                (iv) Cost per unit; and

                (4)(A) Intended use of grant.  

                        (B) Describe construction, modification, alteration, or retrofitting of feedstock processing facility.

                        (C) Include pro forma operating statement, cash flow analysis, projected per unit cost, permitting requirements, and anticipated markets for feedstock.



	
		
		
		<style type="text/css">
			.cs619A0A30{text-align:left;text-indent:0pt;margin:0pt 0pt 0pt 0pt;line-height:1.65}
			.csCCA19CAA{color:#000000;background-color:transparent;font-family:Tahoma,Arial;font-size:12pt;font-weight:bold;font-style:normal;}
			.cs1E246FCB{color:#000000;background-color:transparent;font-family:Tahoma,Arial;font-size:12pt;font-weight:normal;font-style:normal;}
		</style>
	
	
		<p class="cs619A0A30"><span class="csCCA19CAA">        2 CAR &sect; 1-302. Narrative summary.</span></p><p class="cs619A0A30"><span class="cs1E246FCB">        (a)(1) A narrative description of the proposed project is required. </span></p><p class="cs619A0A30"><span class="cs1E246FCB">                (2) The format, style of presentation, and length may vary depending on the nature of the project. </span></p><p class="cs619A0A30"><span class="cs1E246FCB">        (b) The narrative shall include the following sections:</span></p><p class="cs619A0A30"><span class="csCCA19CAA">                </span><span class="cs1E246FCB">(1)(A)</span><span class="csCCA19CAA"> </span><span class="cs1E246FCB">Ownership. &nbsp;</span></p><p class="cs619A0A30"><span class="cs1E246FCB">                        (B) Legal ownership along with the names, titles, contact information, and roles of principal participants in feedstock processing facility;</span></p><p class="cs619A0A30"><span class="csCCA19CAA">                </span><span class="cs1E246FCB">(2)(A) Location. </span></p><p class="cs619A0A30"><span class="cs1E246FCB">                        (B) Physical address of facility;</span></p><p class="cs619A0A30"><span class="csCCA19CAA">                </span><span class="cs1E246FCB">(3)(A) Description of current operation. </span></p><p class="cs619A0A30"><span class="cs1E246FCB">                        (B) If in operation, describe facility including:</span></p><p class="cs619A0A30"><span class="cs1E246FCB">                                (i) Feedstock processed; </span></p><p class="cs619A0A30"><span class="cs1E246FCB">                                (ii) Current market; </span></p><p class="cs619A0A30"><span class="cs1E246FCB">                                (iii) Production levels; and </span></p><p class="cs619A0A30"><span class="cs1E246FCB">                                (iv) Cost per unit; and</span></p><p class="cs619A0A30"><span class="csCCA19CAA">                </span><span class="cs1E246FCB">(4)(A)</span><span class="csCCA19CAA"> </span><span class="cs1E246FCB">Intended use of grant. &nbsp;</span></p><p class="cs619A0A30"><span class="cs1E246FCB">                        (B) Describe construction, modification, alteration, or retrofitting of feedstock processing facility. </span></p><p class="cs619A0A30"><span class="cs1E246FCB">                        (C) Include pro forma operating statement, cash flow analysis, projected per unit cost, permitting requirements, and anticipated markets for feedstock.</span></p>

No notes are currently available.
Arkansas Code § 15-13-305